Our Work in Terlingua

Above, we are grading and widening a road that was rough cut. Towards the end of the video we test the road with our 20′ gooseneck and discover that a couple of the turns are still a little too tight.

Below we are installing 24′ steel posts in the ground for a shade structure. We performed a final scrape of the road and leveled out the job site for ease of future construction.

In the video below, the owner of this dome house wanted more earthen material placed on top. Due to the proximity of propane tanks it was not safe for us to travel on top of the home, we placed as much material on the side as we could reach, and created a dry stack of large rocks surrounding the right side of the entryway.

For WoodGate Road, we regraded the road that reaches the interior of this property from the highway. This road was crossed by two dry creeks and needed some erosion control.

On the way back out to Terlingua my last trip, I stopped in at ProFab Welding in Mason, Texas to pick up this really nice (and RED!) rock bucket. Let me tell you, it is extremely well built and has excellent carrying capacity. It is well paired with my SVL 75-3 https://www.profabweld.com/